Project Portfolio

HEB Grocery

  • Project Location: Pleasanton/Wimberly, TX
  • Owner/Client: HEB Grocery
  • Project Description:

HEB Grocery locations in Pleasanton and Wimberly were seeking to cut operating costs by installing new air conditioning systems for their administrative and cash flow areas. As an industry leader, HEB wanted to set the standard for energy efficient technology that would create energy and maintenance savings to be passed down to shoppers.

DXS was chosen as the basis of design for this project due to the reputation that both DXS and Daikin have in the industry. DXS equipped the stores with mixtures of heat recovery, ducted, and cassette units that demonstrated how VRV technology operates to air condition the smaller administrative areas differently than the large open grocery store while still saving energy.


Retail & Office Key Considerations

Architects and engineers working in the retail and professional office building markets consistently face the same scenario:  the ever-changing need to reconfigure tenant space.  As businesses change, their space requirements can fluctuate wildly.  They move, they expand, they downsize.  And because they do, DXS works alongside architects, engineers and owners to design VRF systems that can be configured – and reconfigured – to meet on-going and changing tenant HVAC requirements.

Key Considerations

  • Opportunity to reduce overall building construction cost
  • Designed as a modular system to any specifications required by the project
  • System is easily reconfigured after installation
  • Tight temperature controls of multiple zones for multiple tenants
  • Experienced staff and products that have the ability to interface with a wide variety of control systems
  • DXS onsite at five key junctures:  onsite training prior to installation, quality control checks during installation, during start-up, 30 days after commissioning for building owner verification, and ongoing training for staff
  • Fast, dependable service and maintenance support after installation
  • Complete inventory of parts and equipment locally stocked