Project Portfolio

City Works at the Star

  • Project Location: Frisco, TX
  • Owner/Client: City Works
  • Project Description:

This project was the first Daikin VRV project for the installing mechanical contractor. After the project was awarded, we had a very short timeframe before installation to get the contractor trained to install the VRV system. In the end, DXS equipped the building with 66 Tons of Daikin VRV Heat Recovery, and one 6500 CFM Daikin Rebel 100% DOAS unit, meeting efficiency, sound, and timeline requirements.


Retail & Office Key Considerations

Architects and engineers working in the retail and professional office building markets consistently face the same scenario:  the ever-changing need to reconfigure tenant space.  As businesses change, their space requirements can fluctuate wildly.  They move, they expand, they downsize.  And because they do, DXS works alongside architects, engineers and owners to design VRF systems that can be configured – and reconfigured – to meet on-going and changing tenant HVAC requirements.

Key Considerations

  • Opportunity to reduce overall building construction cost
  • Designed as a modular system to any specifications required by the project
  • System is easily reconfigured after installation
  • Tight temperature controls of multiple zones for multiple tenants
  • Experienced staff and products that have the ability to interface with a wide variety of control systems
  • DXS onsite at five key junctures:  onsite training prior to installation, quality control checks during installation, during start-up, 30 days after commissioning for building owner verification, and ongoing training for staff
  • Fast, dependable service and maintenance support after installation
  • Complete inventory of parts and equipment locally stocked