Cane Rosso and Cowtipping Creamery

  • Project Location: Frisco, TX
  • Owner/Client: Cane Rosso
  • Project Description:

Daikin and DXS were able to offer a reduced cost 100% OA solution in order to fight the budget issues surrounding the stainless steel pipe run required for their pizza oven. Tight construction deadlines and equipment availability were also major driving factors for this project. We provided 30 Tons of Daikin VRV Heat Recovery Systems feeding 15 fan coil units, using both cassettes and ducted AHUs. 14 Tons of Daikin VRV 100% OA Split Systems add to the desired energy efficiency with multi-zone cooling.


Retail & Office Key Considerations

Architects and engineers working in the retail and professional office building markets consistently face the same scenario:  the ever-changing need to reconfigure tenant space.  As businesses change, their space requirements can fluctuate wildly.  They move, they expand, they downsize.  And because they do, DXS works alongside architects, engineers and owners to design VRF systems that can be configured – and reconfigured – to meet on-going and changing tenant HVAC requirements.

Key Considerations

  • Opportunity to reduce overall building construction cost
  • Designed as a modular system to any specifications required by the project
  • System is easily reconfigured after installation
  • Tight temperature controls of multiple zones for multiple tenants
  • Experienced staff and products that have the ability to interface with a wide variety of control systems
  • DXS onsite at five key junctures:  onsite training prior to installation, quality control checks during installation, during start-up, 30 days after commissioning for building owner verification, and ongoing training for staff
  • Fast, dependable service and maintenance support after installation
  • Complete inventory of parts and equipment locally stocked